Test (monthly)
In compliance with item 4 of the general technical approval the conveyor system shutter shall be tested for operational conditions once a month by the operator as proof of serviceability of the object of approval. The findings of the test shall be recorded in the test book.
Scope of test
- Check of serviceability of the applied hold-open device.
- Check of the components used for monitoring opening procedures.
Test Prerequisites
The conveying plant is active
- There is no material to be conveyed in the closing area.
- The hold-open device respectively the controls are in operation.
Performance of Test
- Principally a visual test of the mechanical components as to damages shall be performed.
- The components used for monitoring opening procedures respectively positions shall be checked visually for mechanical intactness and correct alignment (e.g. alignment of light barriers).
- The control indicators of the hold-open device respectively of the controls shall be checked for their plausibility.
- At the end a closing process shall be released by using the operating element provided for that purpose.
- The conveyor system shutter shall move into closing position in smooth running.
- The control indicators shall be checked.
- The conveyor system shutter shall be opened by using the device provided for that purpose.
- The movement shall be smoothly possible.
- The conveyor system shutter shall safely reach the final position.
- The control indicators shall be checked.
- Creation of the basic operation state (e.g. resetting of activated maintenance switches).
- Recording of performed tests with date and signature in the test book.